Mining Claim Work
Access roads to remote claims, level drill and equipment pads, portals and dumps, and reclamation when the work is done. Most of it is steep, rocky and off the grid.
37.8117° N 107.6645° W · Silverton, Colorado
For decades Maisel Excavation has cut roads, set foundations, opened mining claims and installed septic systems where the grade is steep, the season is short and the ground is rock.
Sec. 01 — What we do
Mining claims, foundations, roads and septic systems. Most of it is above nine thousand feet.
Access roads to remote claims, level drill and equipment pads, portals and dumps, and reclamation when the work is done. Most of it is steep, rocky and off the grid.
We dig, over-excavate and prep foundations on slopes and frost-prone soils: cut-and-fill, retaining, structural backfill and drainage, squared up for the concrete crew.
From a single switchbacked driveway to miles of mountain road: we lay out grade, cut bench, set culverts, armor the ditches and build a base that drains through spring runoff. Past work includes road for power plants, mines and private claims.
At this elevation a septic system has to allow for short seasons, hard freezes and tight, rocky leach fields. We excavate and install tanks and drain fields to spec: sited, bedded and backfilled.
Sec. 02 — Jobs
Recent jobs and earlier ones, by place. The clips play without sound. Tap a photo to see it larger.
Above Silverton
The historic mine is being opened up to become an underground lodge. Maisel is doing the dirt work: reopening the portal, benching the access road and hauling shot rock down the mountain.
Above Gladstone
A building site on the ridge.
Northeast of Silverton
Machines, the snowcat and a gravel stockpile.
Excavation and site work at the mill.
Road work on the remote corridor to the historic power plant.
Other jobs, not yet named here.
Sec. 03 — The ground
Silverton sits above 9,300 feet at the heart of the San Juan Mountains, where men have been cutting road and chasing ore since 1875. Up here the building season is measured in weeks, the soil is glacial rock and tailings, slopes run past forty degrees, and the weather can turn a worksite to mud or snow in an afternoon.
This is the ground Maisel Excavation works. Jobs have included moving compressors for mining operations, site work at the Pride of the West Mill, and road work on the remote corridor to the historic Tacoma power plant.
See the jobs
Sec. 04 — The outfit
Maisel Excavation is a Silverton company. When you call, you talk to Pete. He bids the job and he runs the machines.
37.8117° N · 107.6645° W · 9,318 ft
Mining claim, foundation, road or septic.